> Installation Methods
Warning and Directional (CIP) TGSIa
Installation Methods for Finished Surfaces
Method No.5
Concrete, Masonry, Exposed Aggregate, Terrazzo
Installation Method
Installation Type No.17
Cast In Place -
(during the curing of wet concrete)
Tools & Equipment Required
Set down TGSI frame, rubber mallet, tape measure. Fixings are supplied.
Installation Diagram No.17
Method No.6
Concrete Pavers
Installation Method
Installation Type No.18
Boxed
Cast In Place -
(during the curing of wet concrete)
Tools & equipment Required
Set down TGSI frame, rubber mallet, tape measure & concrete boxing. Fixings are supplied.
Installation Diagram No.18
Brick Pavers
Installation Method
Installation Type No.19
Boxed
Cast In Place -
(during the curing of wet concrete)
Tools & equipment Required
Set down TGSI frame, rubber mallet, tape measure & concrete boxing. Fixings are supplied.
Installation Diagram No.19
Asphalt
Installation Method
Installation Type No.20
Boxed
Cast In Place -
(during the curing of wet concrete)
Tools & equipment Required
Set down TGSI frame, rubber mallet, tape measure & concrete boxing. Fixings are supplied.
Installation Diagram No.20
Method No.7
Ceramics, Vitrified Tiles
Installation Method
Installation Type No.21
Drill
Clean
Plug
Pack
Glue & Fixing
Tools & equipment Required
Set down TGSI frame, Plywood, tape measure & concrete boxing. Cordless drill, drill bits, Isopropyl alcohol, clean rags, hammer & rubber mallet. Fixings & plugs are supplied.
Installation Diagram No.21
Bluestone, Granite, Limestone, Sandstone, Engineered Stone
Installation Method
Installation Type No.22
Drill
Clean
Plug
Pack
Glue & Fixing
Tools & equipment Required
Set down TGSI frame, Plywood, tape measure & concrete boxing. Cordless drill, drill bits, Isopropyl alcohol, clean rags, hammer & rubber mallet. Fixings & plugs are supplied.
Installation Diagram No.22
Carpet (Thick) - Loop Pile (With Underlay)
Installation Method
Installation Type No.23
Drill
Clean
Plug
Pack
Glue & Fixing
Tools & equipment Required
Set down TGSI frame, Plywood, tape measure & concrete boxing. Cordless drill, drill bits, Isopropyl alcohol, clean rags, hammer & rubber mallet. Fixings & plugs are supplied.
Installation Diagram No.23
Method No. 8
Vinyl
Installation Method
Installation Type No.24
Set-Down
Drill
Clean
Plug
Pack
Glue & Fixing
Tools & equipment Required
Concrete recess, set down TGSI frame, plywood, tape measure. Cordless drill, drill bits, Isopropyl alcohol, clean rags, hammer & rubber mallet. Fixings & plugs are supplied.
Installation Diagram No.24
Method No. 9
Timber, Wood Plastic Composite (WPC) and Decking timber
Installation Method
Installation Type No.25
Recess
Board
Drill
Clean
Plug
Pack
Glue & Fixing
Tools & equipment Required
Compressed cement sheet on joists and packing, tape measure, cordless drill, drill bits, Isopropyl alcohol, clean rags, Fixings & plugs are supplied.
Installation Diagram No.25
> Installation Services
Installation Services
Services Offered by ESP
Installation
Installation Services can be facilitated through ESP Australia on request.
To check the Accredited ESP Applicator Network, call now on 1300 665 761
To inquire about a specialised service from ESP, call 1300 665 761 or send and email through our contact page. Click Here
Consultation and Advice
Through it’s professional network, ESP Australia can also arrange and provide on site testing services including:
Project TGSI Luminance Testing
Project TGSI Slip Resistance Testing
TGSI Application and Installation Advice
Special TGSI Products for Municipalities
TGSI Estimating and Project Quantity Surveying
Coordination of TGSI Installation
TGSI Product Induction & Training